Portable conveyor systems, quick setup and tear down, modular design, add length up to 100 feet.

Cost Savings to You
When You Use Add-A-Veyor/Porta-Veyor

Save labor and save money with Add-A-Veyor/Porta-Veyor.
Saving on labor costs with Add-A-Veyor/Porta-Veyor adds to your bottom line. Better efficiency, reduced labor costs, higher profits.

Rising labor costs and associated overhead expenses (taxes, insurance, etc.) mean that if you can save on labor costs, you can greatly improve your bottom line. To make this point, here are some example cost savings calculations for a truck loading application: we will compare baseline costs versus the identical application which uses the Add-A-Veyor/Porta-Veyor.

As you will see, you come out ahead by using the Add-A-Veyor/Porta-Veyor because:

  • The Add-A-Veyor/Porta-Veyor increases efficiency
  • The Add-A-Veyor/Porta-Veyor increases productivity
  • The Add-A-Veyor/Porta-Veyor lowers labor costs
  • The Add-A-Veyor/Porta-Veyor adds to your bottom line profits

Example: Truck Loading Job

  People
Required
Hourly
Labor
Rate
Hours
Required
Cost
Manual 6 $6.15 6 $221.40
Add-A-Veyor/Porta-Veyor 3 $6.15 6 ** $110.70
Your Savings 3     $110.70

** Because the Add-A-Veyor/Porta-Veyor has a variable speed control,
you can set the pace you desire, and you probably
will be able to reduce the load/unload time.

Payback in Less than One Year

A Add-A-Veyor/Porta-Veyor can pay for itself in less than one year. Here is how:

Minimum yearly cost for 1 laborer
($6.15 per hour for 50 weeks)
$12,300
Approximate cost for 1 75-foot Add-A-Veyor/Porta-Veyor $10,000
Savings in the first year $2,300

Your savings can be even larger, depending upon the number of laborers you can eliminate and the number of Add-A-Veyor/Porta-Veyors and crews you have. Of course, your costs and savings may vary, and the figures used are for example only.